after completion of the training project and tool box the construction finally starts on Dec 23rd 2019 with section 06 – the vertical stabelizer …
The major learnings from those little projects are
- pressure for rivet gun as little as required to drive the rivet (on my gun a little less than 2 bars with fine adjustment in position 1) für AN426 flush rivets
- protection of neighbouring surfaces when using bucking bar (especially when working alobe)
- avoid uneccessary flex by proper of clamps, …
- always double check after setting up the tools and items and before starting the job
- have a clean and well organized working area suited for the next job